MCC Baosteel的基层单元完成Baori Auto Plate集中式系列固定维修和提升任务
企业动态| 浏览量:0| 2025-08-03 08:30:06 |

From August 1 to the present, all units of Baori Auto Plate have been shut down for regular repairs, the acid-rolled C402 unit has been shut down for 48 hours, the continuous C412 unit has been shut down for 96 hours, the 2# CLG hot-dip galvanized C508 unit has been shut down for 168 hours, and the 3# CLG hot-dip galvanized C808 unit has been shut down for 36 hours. For factors such as points, lines, surfaces, and wide in the on-site series of fixed repairs, frequent cross-operation of man-machine, difficult lifting, long duration, narrow work space, blind spot angles, etc. the leaders of the grassroots unit of MCC Baosteel attach great importance to it, implement special safety education for fixed repairs for all staff, formulate a plan for cooperation with fixed repairs, and adopt the original method of remote control operations as the main and driving作为辅助操作。该小队领导者领导着领导者,工人亲自照顾了这一点,并与硕士学位保持着强大的安全意识和出色的技能协调,以与固定的维修合作和举重进行配合,以确保安全地控制大型固定维修和提升操作。

不时驾驶口哨声的声音促使热浪波浪在空中蔓延。实施防热和冷却工作是夏季安全工作的重中之重。地面遥控操作员及时协调以交换人员,以确保人员的精神状态和预防热量和冷却物品的正常供应。在更换3#CLG热浸镀锌C808单元的锌锅淬孔凹槽下沉辊中,驾驶工人充分利用了自己的优势,技能和经验。对地面进行远程控制,并在运行前跟踪并确认提升物体,并以缓慢的速度抵抗操作。由于水猝灭凹槽下沉的滚轮在坑里,并且驾驶钩子没有放在位置,因此驾驶工人大胆建议使用双悬浮液连接并将手动吊筒与驾驶主体结合起来,以进行坑吊顶操作。驾驶工人冷静地做出了反应,战斗技巧,面临挑战,并使用一速操作缓慢运行并抬起水凹槽下沉的滚筒到指定位置,成功完成了组装和更换。

酸滚动C402单元的校正机的替换项目是技能和耐力的竞争。由于校正机的更换和抬起很长,因此滚动磨机跨度很小,并且在拆卸和重新安装过程中其大小不规则。同时,需要同时使用1-2个驾驶子钩子和慢跑hoist,这增加了操作和提升风险的困难。 MCC Baosteel的基层单元借鉴了以前的成功体验,并且在拆除和重新安装校正机的过程中,它首先在地面上工作以修复校正机。在电动起重机和手动提升的组合中,举起手以缓慢而低端的连接并运行。确认小规模的微调和慢跑操作,以确保每个操作步骤都是准确且适当的。取代和解除酸滚动C402单位校正机的任务已成功完成,并获得了Baosteel Co.Ltd。和相关单位的一致赞美和强烈的赞美。

连续的高温是在生产的前线上战斗的人们炎热。尽管他们在大量出汗,并且在高温中难以忍受,但参加战争的人们并不害怕困难或疲劳。他们与高温竞争,用汗水进行工作,然后沿热浪向前移动。他们为什么在与高温作斗争时害怕出汗?与炎热的热量作斗争的最初意图保持不变。凭着普通的持久性,我们对我们的职业进行了钦佩,并在普通职位上写了一篇精彩的章节。

1.jpg



复制成功
咨询电话: 15595696085

扫下方二维码添加微信好友
我知道了
咨询